2025 BluBOX Product Lifecycle and Lead-Time Transparency Report
“No More ‘Out of Stock’ Surprises - Ever.” A Complete, Integrator-Ready Guide to Product Availability, Lifecycle Status & Supply Predictability
Introduction - Why This Report Matters
Across the security industry, integrators cite one frustration above all others: unpredictable product availability.
Backorders, unpublished end-of-life notices, surprise lead times, and inconsistent shipping destroy project schedules, cause customer embarrassment, and erase profit margins.
BluBØX solves this with total transparency:
- Clear product lifecycle status
- Published lead times
- Predictable availability
- Cloud-first architecture that reduces hardware dependency
This report gives integrators everything they need to plan confidently - no guessing, no surprises, no excuses.
Section 1 - Lifecycle Definitions
A simple system that eliminates ambiguity.
Every BluBØX hardware product falls into one of four lifecycle stages:
Active Full production, full support, recommended for all new deployments.
Supported Manufactured or stocked; supported for existing deployments. Ideal for expansions or legacy-matching installations.
Limited Availability Tight supply or scheduled phase-out. Available only for approved projects.
End-of-Life (EOL) No longer manufactured; upgrade paths recommended. EOL hardware remains supported under BluCARE.
BluBØX Advantage: Because BluSKY is cloud-native, system functionality continues even when hardware cycles evolve - reducing lifecycle risk.
Section 2 - 2025 Product Lifecycle Table
A. Controllers (ARC Series)
| Product | Lifecycle | Lead Time | Notes |
|---|---|---|---|
| ARC-1 | Active | 2-4 weeks | Standard controller, widely deployed |
| ARC-2 | Active | 3-6 weeks | High-performance; ideal for elevators and enterprise access |
| ARC-4 | Active | 3-6 weeks | Advanced multi-I/O edge device |
Integrator Benefit: ARC controllers remain stable with predictable production and no planned 2025 discontinuations.
B. Person Readers (PRX / LTS Series)
| Product | Lifecycle | Lead Time | Notes |
|---|---|---|---|
| PRX-LT Series | Active | 4-8 weeks | Multi-authentication (face, mobile, card, QR) |
| PRX-XL | Supported | 4-6 weeks | High-traffic lobbies |
| Legacy Models | EOL | N/A | Supported for installed base; upgrade path available |
2025 Trend: Demand rising 20-35%. Priority allocation for certified integrators.
C. Readers / Door Hardware
| Product | Lifecycle | Lead Time | Notes |
|---|---|---|---|
| BluID/BluREMOTE Readers | Active | 2-4 weeks | Ideal for mobile + card |
| HID-Compatible BPN2/BPN1 | Supported | 4-6 weeks | Required for certain OEM kiosks |
| Legacy HID / Third-Party Readers | Limited | 4-10 weeks | Market-wide variability |
Industry Context: BluID solutions reduce dependency on volatile HID supply chains.
D. Cameras (AVMS Ecosystem)
| Camera Type | Lifecycle | Lead Time | Notes |
|---|---|---|---|
| ONVIF IP Cameras | Active | 2-5 weeks | Stable supply |
| AI-Ready Cameras | Active | 3-6 weeks | Pre-qualified for SceneIT, AutoLabel, RaceTrack |
| Legacy Cameras | Limited | Varies | Supported but not recommended |
Integrator Note: Use BluBØX’s recommended camera list for optimal AI performance.
E. Elevator Components (DDE Integrations)
| Product | Lifecycle | Lead Time | Notes |
|---|---|---|---|
| DDE Relay Boards (ARC-2) | Active | 3-6 weeks | Primary DDE integration path |
| OEM Panels | Supported | Varies | Manufacturer-dependent |
| Legacy Serial Interfaces | EOL | N/A | Upgrade required |
Industry Insight: OEM elevator hardware lead times are long; ARC reduces dependency.
Section 3 - 2025 Lead-Time Forecast
What integrators can expect this year:
- Controllers: Stable
- Person Readers: Demand increasing; Q3/Q4 may tighten
- Cameras: Stable; AI-ready models preferred
- Elevator I/O: Plan early due to OEM cycles
- Mobile Credentials: Instant delivery
- Accessories: Stable, 1-3 weeks
AI Impact: Accelerating AI adoption is increasing demand for Person Readers and AI-ready cameras. BluBØX has expanded procurement to prevent shortages.
Section 4 - Supply Predictability Guarantees
BluBØX policies that eliminate integrator risk:
- Guaranteed Allocation for certified partners
- 90-Day Forecast Visibility
- Zero Hidden EOL Decisions
- Priority Replacement & RMA Stock
- Cloud-Driven Lifecycle Stability
Predictability becomes a strategic advantage.
Section 5 - How Integrators Use This Report to Win Jobs
Transparency gives integrators a competitive edge:
- Bid confidently
- Reduce risk buffers
- Accelerate deployment timelines
- Avoid customer-facing delays
- Prevent integration-breaking surprises
- Eliminate callbacks caused by late hardware
Better predictability = better projects = happier clients.
Section 6 - Sample Project Planning Template
Include a one-page planner with:
- Hardware list
- Lifecycle status
- Lead time
- Install date
- AI readiness
- Risk score
- Mitigation plan
A repeatable planning workflow for every BluBØX deployment.
Call to Action
Build Better Projects With Transparent, Predictable Supply.
Download(PDF)> BluB0X_Product_Lifecycle_2025.pdf